With  the  entry  of  large-scale  projects  such  as  Fortune  Center,  CCTV  and  BTV  Center,  the  communication  conditions  of  CBD  is  being  highly  focused  by  the  public  for  weather  CBD  will  be  blocked  by  the  traffic  jams£¿
Mr.  Chen  Gang,  the  governor  of  Chaoyang  District  has  ever  clearly  expressed  on  the  domestic  and  overseas  news  release  conference,  after  the  careful  research  by  traffic  experts,  according  to  the  modified  plan  on  the  extensive  CBD  region  with  the  area  of  82  square  kilometers,  Chaoyang  District  will  complete  the  route  network  renovation  at  CBD  region  in  three  years  to  ensure  building  up  perfect  traffic  network  before  large-scale  projects  are  accomplished.
By  2007,  CBD  region  will  finish  the  road  construction  of  30  kilometers,  which  includes  1  urban  highway,  2  major  trunk  lines,  6  minor  trunk  lines  and  80  urban  braches.

I.  The  communication  of  CBD  in  the  future<BR>     On  the  basis  of  the  CBD  communications  plan  showed  on  the  business  festival,  let?s  look  at  the  traffic  conditions  of  CBD  region.
The  internal  transit  cycles:  the  buses  will  form  up  the  independent  system  in  CBD.  When  enter  CBD,  there  are  two  optional  transit  cycles,  one  one  is  the  special  road  for  bus,  and  the  other  is  only  for  the  large-volume  buses.  At  the  edge  of  CBD,  there  will  be  four  bus  stations,  respectively  standing  at  the  northeast  corner  of  Dabeiyao,  the  northwest  corner  of  Dabeiyao,  the  north  end  of  the  regional  southeast  greenbelt,  and  the  west  of  Jingguang  Center.  You  can  take  the  bus  at  the  stations  outside  of  CBD  or  subway  stations  to  enter  CBD.
Four  subway  lines  and  seven  subway  stations:  in  the  future,  it  is  a  good  choice  to  enter  CBD  by  subway.  The  planned  Line  4  subway  will  take  up  the  capacity  of  40%  of  the  mass  entering  CBD,  with  people  flow  at  36,000  persons  each  day.  Now,  there  are  3  subways  stations  on  Line  1,  namely,  Guomao,  Yong'anli  and  Dawanglu.  In  the  future,  the  interchange  station  of  Guomao  will  be  increased,  as  well  as  the  Guanghualu  station,  Hujialou  station  on  the  Line  10,  and  the  Jializhongxi  station  on  Line  14.
Two  layers  of  underground  pedestrian  roads:  after  the  underground  spaces  are  connected  in  CBD  region,  the  effect  of  free  underground  traffic  will  be  reached.  The  first  underground  layer  is  mainly  for  the  commercial  facilities  and  pedestrian  roads,  in  which  the  pedestrian  roads  are  linked  with  the  aboveground  pedestrian  space  and  the  second  underground  layer  to  form  up  the  3D  pedestrian  roads  system.  In  the  future,  if  you  want  to  go  to  Fortune  Center,  it  is  not  necessary  to  walk  on  the  ground  under  strong  sunshine,  but  enter  the  underground  ways  standing  at  the  edge  of  CBD  and  reach  the  destination  by  passing  through  the  agreeable  commercial  environment;  you  can  also  have  the  other  option  to  drive  at  the  second  underground  layer,  and  the  exits  of  the  underground  parking  lots  are  connected  with  the  trunk  lines  aboveground.
Parking  inside  CBD:  it  is  planned  to  have  63,450  parking  lots  inside  CBD,  in  which  90%  is  in  underground,  mainly  the  second  layer,  with  the  construction  area  of  2.5  million  square  meters.  In  addition,  several  shopping  centers  will  be  built  at  the  second  underground  layer  to  form  the  network  with  the  commercial  premises  at  the  first  underground  layer.
Theme  parks:  the  orbicular  greening  system,  two  greening  axles  and  four  theme  parks  are  specially  arranged  in  the  overall  plan,  with  the  concentrated  greening  rate  at  10.5%;  therefore,  no  matter  passing  through  the  mansions  or  taking  a  walk  to  the  bus  station,  you  will  be  surrounded  by  the  greenbelts  to  eliminate  the  strain  and  weariness.

II.  The  production  process  of  CBD  communication  plan
The  specific  communication  plan  was  started  on  April  2001,  to  cooperatively  draw  up  the  CBD  Communications  Plan  by  Beijing  Municipal  Academy  of  Urban  Planning  and  MVA  Hong  Kong  Advisory  Co.,  Ltd..  From  August  2001  to  March  2002,  many  domestic  and  overseas  experts  were  invited  to  carefully  evaluate  this  plan,  which  was  successfully  approved  by  the  Beijing  Municipal  Government  on  July  15th,  2002.
In  order  to  accomplish  this  plan,  the  relevant  departments  have  investigated  the  traffic  flow  at  each  period  of  time,  as  well  as  the  traffic  situations  of  other  regions  in  Beijing  and  worldwide  CBDs,  so  as  to  draw  up  the  scientific  layout.  In  this  plan,  it  is  required  that  the  junctions  to  each  mansion  must  be  linked  with  the  minor  trunk  line,  so  that  the  vehicle  can  be  driven  onto  the  major  and  minor  trunk  lines  from  any  exit  of  the  building,  which  will  not  form  up  the  traffic  pressure  in  CBD  region.

III.  Establish  up  the  auxiliary  planning  and  increase  the  construction  strength
At  present,  CBD  committee  and  relative  department  are  drawing  up  the  traffic  planning  for  the  roads  around  CBD,  which  is  the  total  area  of  82  square  kilometers  covering  the  area  from  Chongwenmen  Nei  Avenue  to  east  Loop  5,  and  from  Airport  Highway  to  Guangqu  Road.  The  traffic  experts  will  carefully  perform  the  assessment  on  this  plan  in  terms  of  the  traffic  network  adjustment,  junction  renovation,  bus  station  layout,  and  bus  line  adjustment,  so  as  to  essentially  guarantee  the  free  communications  in  CBD.